Rehabilitation of Lake Velence shore-walls - Colas Alterra
Rehabilitation of Lake Velence shore-walls
As the leader of the Velence 2016 consortium, Colas Alterra Zrt. has been selected to carry out the 10-billion-forint project entitled “complex sustainable rehabilitation of Lake Velence shore-walls” jointly with Swietelsky Magyarország Kft. The scheme aims to improve the lake’s water quality, conserve the natural values of the shoreline, and to ensure and sustain proper ecological conditions.
During the construction works, our primary responsibilities include the reconstruction and heightening of shore-walls, the renovation of jetties and wharfs, and the formation of natural beaches. Furthermore, we will carry out various types of dredging works, complemented by the establishment of nearby deposits for dredged materials.

Starting date: 08/05/2018Kezdés: 2018.05.08.

Completion date: 15/06/2021Befejezés: 2021.06.15.

Location: Lake Velence