Némedi Road Underpass
The underpass located at the intersection of Némedi út and Dózsa György út—a key component of the development of the Budapest–Belgrade railway line—has been expanded to nearly twice its original size and made more modern and safer.
Constructed by Colas Út Zrt., a modern reinforced concrete structure with a 13.8-meter span was built to accommodate road, bicycle, and pedestrian traffic beneath the No. 150 railway line.
Constructed by Colas Út Zrt., a modern reinforced concrete structure with a 13.8-meter span was built to accommodate road, bicycle, and pedestrian traffic beneath the No. 150 railway line.
Client: CTEC Kft.
Starting date: 01/11/2023Kezdés: 2023.11.01.
Completion date: 01/12/2025Befejezés: 2025.12.01.
Structural concrete: 4500 m3Szerkezeti beton: 4500 m3