Contracting Achievements at Alterra
Works Council Election at the Colas Group
Introducing the Company Group’s New CFO: Ádám Kengyel
Colas Hands Over D1 Section of the Motorway M0 Ring
Handover Ceremony at Rédics: Reconstruction of a 29-km-long Section Concludes
Linkup under Budapest`s Grand Boulevard
COL3 LOT4 – Construction of the Kerepesi Road Main Collector
One Year of Drainage Construction at Érd
Pavement Reinforcement and Noise Wall on the M0
ROP-Financed Road Reconstruction Works at Colas Út
Works Roar Ahead Undisturbed on the M0’s Danube Bridge at Háros
Goings-On in the Rába Riverbed
Concrete Paving Nearly Complete on the Colas Section of the M0’s D2 Phase
Our colleagues: Sándor Egri, Zoltán Burik, Rita Révész, Imre Buda, Szabolcs Pityi, Zoltán Csamangó
Meeting point: Szentgotthárd
The First Colas Art Contest for Children
Ultrabalaton 2012
Martos and Herz Diesel-Powered Road Roller
Északkő Receives Award for Saving Eagle Owls’ Habitat
Health and Safety Inspection at Északkő
Destination Istanbul
Miners’ Day at Colas Északkő