M35 motorway, Phase 1 (Main road 4-Airport access road 481)
The first phase of the section between Debrecen and Berettyóújfalu of motorway M35 constructed between main roads 4 and 481 will be 5.4 km long. The motorway will have 2 × 2 lanes separated by median and additional emergency lane will be constructed. Two multi-level interchanges will be constructed on the section at main roads 4 and 481. Consturction is carried out by Colas Hungária Zrt. and Colas Út Zrt.
Five bridges will be build during the realization of the project. In order to provide access to aggricultural lands, parallel earth roads will be constructed.
More than 900 thousand m3 earthworks, 30 800 m3 cement base layer and 75 000 tons of ashpalt will be constructed.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 13/06/2016Kezdés: 2016.06.13.
Completion date: 13/12/2017Befejezés: 2017.12.13.
Location: Hajdú-Bihar County
Length: 5.4 kmHossz: 5.4 km
Section: 43+620 - 49+050Szelvény: 43+620 - 49+050
Number of lanes: 2x2 + emergency lanesSávok száma: 2x2 + emergency lanes
Asphalt: 75 000 tAszfalt: 75 000 t
Concrete: 30 800 m3Beton: 30 800 m3
Earthworks: 900 000 m3Földmunka: 900 000 m3
Number of structures: 5Műtárgyak száma: 5
Section: 43+620 - 49+050Szelvény: 43+620 - 49+050
Number of lanes: 2x2 + emergency lanesSávok száma: 2x2 + emergency lanes
Asphalt: 75 000 tAszfalt: 75 000 t
Concrete: 30 800 m3Beton: 30 800 m3
Earthworks: 900 000 m3Földmunka: 900 000 m3
Number of structures: 5Műtárgyak száma: 5