M4 motorway, section II
We kicked off works on the M4 motorway between the M0 and Cegléd (chainages 70+500 – 73+235 km) in December 2016, and the project is set to be handed over in September 2019. The job entails the installation of some 35,500 tonnes of asphalt, 14,000 cubic metres of cement-based stabilisation and 195,000 cubic metres of embankment material in line with the relevant standards. Furthermore, we are to build the multi-level interchange of between the M4 and main road 311, as well as all 6 engineering structures on the entire project (M4 58+821-73+235).
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 10/04/2017Kezdés: 2017.04.10.
Completion date: 30/09/2019Befejezés: 2019.09.30.
Length: 2.7 kmHossz: 2.7 km
Section: 70+500-73+235Szelvény: 70+500-73+235
Asphalt: 35 500 tAszfalt: 35 500 t
Concrete: 14 000 m3Beton: 14 000 m3
Earthworks: 195 000 m3Földmunka: 195 000 m3
Number of structures: 6Műtárgyak száma: 6
Section: 70+500-73+235Szelvény: 70+500-73+235
Asphalt: 35 500 tAszfalt: 35 500 t
Concrete: 14 000 m3Beton: 14 000 m3
Earthworks: 195 000 m3Földmunka: 195 000 m3
Number of structures: 6Műtárgyak száma: 6