Embankment construction, water engineering, pavement building, traffic engineering, and planting works in connection with the project were assigned to Colas Út Zrt. As an indication of the job’s complex nature, the first part of the section is located in a densely built-up area. Consequently, in addition to a sidewalk and a bicycle road, we were to build a service road with adjoining driveways, establishing sufficient drainage and six junctions.
The double-span bridge structure was constructed over the railway tracks in the area of the Mezőberény railway station. The railway line is part of the pan-European Transport Corridor IV, which requires particular attention with respect to technological planning and the organisation of works.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 27/04/2012Kezdés: 2012.04.27.
Completion date: 29/05/2014Befejezés: 2014.05.29.
Location: Mezőberény
Number of lanes: 2x1Sávok száma: 2x1
Concrete: 3 700 m3Beton: 3 700 m3
Earthworks: 55 000 m3Földmunka: 55 000 m3
Number of supports: 3Támaszok száma: 3
Number of beams: 38Gerendák száma: 38