Bridge at the interchange of roads 8 & 72
In line with the demands of our modern times and in order to meet the demands of increased traffic, the junction of roads no. 8 and no. 72 needed to be reconstructed and made into a multi-level junction. This is subject to a bridge that passed traffic over road no. 8 and continue in multiple directions, thus largely reducing the likelihood of road accidents.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 08/06/2009Kezdés: 2009.06.08.
Completion date: 15/04/2010Befejezés: 2010.04.15.
Location: Veszprém
Length: 53 mHossz: 53 m
Number of lanes: 2Sávok száma: 2
Concrete: 950 m3Beton: 950 m3
Earthworks: 30 000 m3Földmunka: 30 000 m3
Number of supports: 4Támaszok száma: 4