Technical data:
On the Dürer Sor in Ajtos, a complete roadway subgrade replacement was carried out on an area of about 5040 m2 over a length of 280 m, a new trolleybus interchange was installed together with the replacement of the associated overhead line section. A new traffic management system has been implemented to ensure safe traffic flow. New mixed inlet gully grids have been installed. In Zichy Géza Street, 100 m of complete subgrade replacement with reconstruction of the pavement on both sides was carried out. In Abonyi Street, a complete replacement of the pavement layer on the construction side of the structure will be carried out for a length of about 200 fm.
Client: Dürer Befektetési Kft.
Starting date: 01/02/2023Kezdés: 2023.02.01.
Completion date: 18/07/2024Befejezés: 2024.07.18.
Location: Budapest, XIV. kerület Ajtósi Dürer Sor 17-23; Zichy Géza utca 1-5, illetve Abonyi utca