The consortium uniting Colas Út Zrt. (as consortium leader), Colas Közlekedésépítő Zrt. and Colas Hungária Zrt. was engaged by the…
High-speed roads
The first phase of the section between Debrecen and Berettyóújfalu of motorway M35 constructed between main roads 4 and 481 will be…
Works on the four-lane, 7.5-km-long high-speed road section were assigned to the consortium co-founded by Colas Út Zrt. and Euroaszfalt…
On the Enese-Csorna sector, our assignment comprises seven kilometres of 2×2 lane expressway, as well as the erection of five…
Following the Enese bypass section constructed in 2011, Colas is building two further legs of the M85. Construction works for…
As a member of the KCC-2013 Consortium, Colas Út was commissioned with the job following a public-procurement procedure. The project…
As a member of the “M3 Kraszna 2012 Consortium”, Colas Hungária was awarded the construction works of the motorway M3…
Colas was tasked with performing roadworks of the M0 motorway’s new carriageway between chainages 12+140 and 17+300, representing a 10% overall…
This section of the M3 represents the first Eastern-Hungarian motorway to approach the national border, therefore it could be one…
During the widening works of phase 1 of expressway M0, south section between motorways M1 and M6, the expressway was…