M30 Miskolc northern bypass, phase 2
As a member of the KCC-2013 Consortium, Colas Út was commissioned with the job following a public-procurement procedure. The project entails construction works for phase 2 of the M30-main road 26 Miskolc northern bypass, the onramp at road 3, and related engineering structures and auxiliary works, designing, and permitting. The project is divided into two stages: stage A includes some 4.5 kilometres of 2×1-lane road with the related bridge over the River Sajó, whereas stage B covers the interchange of road 3 and the M30 with related engineering structures, public utility relocations, and preparation and permitting of the required designs. Furthermore, the scheme involves construction of the circular flood-control embankment system and drainage channel protecting the village of Arnót, to be built by consortium leader KÖTIVIÉP’B.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 31/08/2013Kezdés: 2013.08.31.
Completion date: 28/02/2015Befejezés: 2015.02.28.
Location: Miskolc
Length: 5.8 kmHossz: 5.8 km
Section: 0+000-5+844Szelvény: 0+000-5+844
Number of lanes: 2x1 / 2x2Sávok száma: 2x1 / 2x2
Asphalt: 21 600 tAszfalt: 21 600 t
Concrete: 11 000 m3Beton: 11 000 m3
Earthworks: 525 000 m3Földmunka: 525 000 m3
Number of structures: 5Műtárgyak száma: 5
Section: 0+000-5+844Szelvény: 0+000-5+844
Number of lanes: 2x1 / 2x2Sávok száma: 2x1 / 2x2
Asphalt: 21 600 tAszfalt: 21 600 t
Concrete: 11 000 m3Beton: 11 000 m3
Earthworks: 525 000 m3Földmunka: 525 000 m3
Number of structures: 5Műtárgyak száma: 5