In early 2010, the Eger Directorate of COLAS ÚT was selected to perform two large-scale reconstruction jobs on the left…
Technologies
The key advantage of low temperature asphalts compared to regular asphalts is the 30% reduction of energy consumption both at…
Trial mixture production and a trial section construction took place in October 2009 in Hungary. We made two kinds of VALORCOL…
The demonstration of a new pothole repair technology first took place on 6 April 2009 during the Tech Day organised…
The trial manufacturing and installation of the first regular LT asphalt with normal bitumen took place in December 2008. The…
Low-temperature asphalt mixture containing CWM additive was first laid with Bituclair binder as red asphalt pavement in the bicycle lane of Alkotmány…
In 2008, we constructed 10 km of noise reducing Rugosoft pavement in 3 cm thickness on the M5 motorway between chainages…
In the village of Bölcske, we accomplished an unusual road constrcution assignment in 2007. During public utility works underneath Templom…