Accessibility of tram stop Zuhatag sor, reconstruction of elevated platform and track
The reconstruction of the Zuhatag Street tram stop included the accessibility of the stop, the reconstruction of the elevated platform and the track. The platforms and the passenger routes have been made barrier-free, new modern decorative paving has been built, the passenger protection is provided by tubular barriers along the entire length of the platforms, the modern passenger lounge has been renovated and relocated, and the tram track and the road crossing along the length of the platforms have been completely modernised and rebuilt.
Technical data: on tram line 56/56A/59B/61, at Versec / Zuhatag street, there is an offset stop in the direction of Széll Kálmán tér and Hűvösvölgy, which has been rebuilt.
Client: BKV Zrt.
Starting date: 17/06/2023Kezdés: 2023.06.17.
Completion date: 07/11/2023Befejezés: 2023.11.07.
Location: Budapest II. kerület, Hűvösvölgy