Bosch, Maklar - infrastructure development around new logistics hall
The LV2 infrastructure development around the new logistics hall of the Bosch Group in Maklar is being carried out by Colas Alterra, which will include the following works:
– construction of utilities (clean storm water drain, oily storm water drain, sewer, drinking water pipeline, fire water pipeline)
– sanitary sewerage, water supply, sewage, sewerage, water supply, sewerage, sewage, water supply
– construction of roads, new green areas and new fencing
– construction of utilities (clean storm water drain, oily storm water drain, sewer, drinking water pipeline, fire water pipeline)
– sanitary sewerage, water supply, sewage, sewerage, water supply, sewerage, sewage, water supply
– construction of roads, new green areas and new fencing
Client: Robert Bosch Automotive Steering Kft.
Starting date: 01/03/2023Kezdés: 2023.03.01.
Completion date: 30/04/2024Befejezés: 2024.04.30.
Location: Maklár