Budapest, Andor Street public utility construction
The public utility line construction job of Colas Alterra is related to the tasks of the Southern Buda relief road construction project in Andor Street.
Main parameters of the project:
- 940 fm concrete sewage and 20 reinforced concrete constructed structures, including pipeworks.
- 697 fm 2 x DN250/400 ISOPLUS insulated steel pipes,
- 24 fm 2 x DN200/315 ISOPLUS insulated steel pipes
- building of 3 new reinforced concrete structures
Starting date: 08/02/2010Kezdés: 2010.02.08.
Completion date: 04/10/2010Befejezés: 2010.10.04.