Rehabilitation of Baross Square - Colas Alterra
Rehabilitation of Baross Square
The wall-to-wall reconstruction of the square was awarded to the SC BAROSS 2012 Consortium uniting STRABAG MML Kft. and Colas Alterra Zrt.

Subsequent to signing the contract in September, both designing and construction organisation works roared ahead at full speed. We took over the job site on 28 September, and outdoor works were finally launched on 12 October.

Taking into consideration the final deadline, the most critical construction phase is probably the reinforced concrete structure of the new underpass. Although the 6000 m2 insulated structure is located 1 metre below groundwater level, the actual challenge is not posed by structural works, but rather by the fact that they are to be carried out without interrupting the significant vehicle and pedestrian traffic passing through Baross square.

Starting date: 12/10/2012Kezdés: 2012.10.12.

Completion date: 30/03/2014Befejezés: 2014.03.30.

Location: Budapest

Earthworks: 13 000 m3Földmunka: 13 000 m3
Area: 6 000 m2Terület: 6 000 m2