Colas Alterra joined in on the works in early June. The assignment covers the construction of three tram stops up to pavement level and establishment of the tracks on Szerémi Road and Hengermalom Road. The affected road sections will also undergo reconstruction, as re-paving, parking space- and bicycle road construction are all part of the company’s scope of works. At some locations, new noise walls are also to be erected. As an interesting improvement, trains coming down from the bridge embankment will run on grassed tracks up to the Fehérvári Road terminal – similarly to Vörösvári Road in Óbuda. The new section will be completed in the first half of 2015.
Client: BKK Budapesti Közlekedési Központ Zrt.
Starting date: 25/10/2013Kezdés: 2013.10.25.
Completion date: 28/01/2015Befejezés: 2015.01.28.
Location: Budapest
Earthworks: 7 000 m3Földmunka: 7 000 m3
Track construction: 2 560 mVágányépítés: 2 560 m
Bite: 15 200 m2Marás: 15 200 m2