The project – involving Colas Alterra as a consortium member – is intended to enhance the water discharge capacity of…
Engineering structures
For several years now, we have had a fruitful partnership with MOL Petrolkémia Zrt., and previous works recently manifested in…
Construction works for two new pools at the Apc slag-powder deposit had come to a close in 2018 and a…
The works contract has been awarded to the consortium of Colas Alterra and Strabag, allowing us to assume a key…
We signed a contract on 17 July 2017 for structural building tasks and the closely related earthworks at a new…
As a response to growing demands on the real estate market, Hermina Center Ingatlanforgalmazó Kft. has launched its “Hermina Happy…
Colas Alterra Zrt. is remodelling the tramway tunnel located at the right bank bridgehead of Budapest’s Chain Bridge. Essentially, the…
Our Major Projects Division was awarded the project of exchanging steel guard rails with precast concrete barriers on motorway M5….
The Szamos-Kraszna flood-control reservoir is the Major Projects Division’s largest water-engineering job. Following preparatory earthworks, the reinforced concrete sheet-pile foundation for the main structure and…
The Western-Transdanubian Water Directorate signed the contract with Colas Hungária Zrt. on 16 April 2012 for reconstruction works of the…