M25 expressway, southern section 2 (Kerecsend-Andornaktálya) - Colas Út
M25 expressway, southern section 2 (Kerecsend-Andornaktálya)
We are currently working on connecting the city of Eger to Hungary’s high-speed road network with a 2×2-lane road, which is being implemented in two distinct phases. Colas Út Zrt. (as a member of a consortium led by He-Do Kft.) signed the contract for the northern part of phase 2 on 20 December 2017. Simultaneously, Colas Út entered into a separate agreement for building the southern part of phase 2.
The overall value of phase 2 – the parts of which are separated by main road 3 – is 35.76 billion forints, and the share of the involved Colas subsidiaries amounts to 27.41 billion.

Client: Nemzeti Infrastruktúra Fejlesztő Zrt.

Starting date: 02/10/2017Kezdés: 2017.10.02.

Completion date: 30/06/2020Befejezés: 2020.06.30.

Location: Heves County

Length: 7.5 kmHossz: 7.5 km
Asphalt: 31 000 tAszfalt: 31 000 t
Concrete: 30 600 m3Beton: 30 600 m3
Earthworks: 927 000 m3Földmunka: 927 000 m3
Number of structures: 3Műtárgyak száma: 3
Colas Hungária