M30 motorway, section B
On the 24-kilometre-long path of section II, we are required to build 2×2 traffic lanes with additional hard-paved emergency lanes on both sides. Moreover, we will establish a complex rest area outside Inárcs, as well as a brand-new operation and maintenance centre for public road operator Magyar Közút in the vicinity of Encs. As part of the works, our consortium will have to build 21 different engineering structures, which entirely falls in the scope of Colas Hungária. In order to attach the region to the country’s high-speed bloodstream, we will form two interchanges at Halmaj and Encs, respectively.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 04/12/2017Kezdés: 2017.12.04.
Completion date: 30/07/2021Befejezés: 2021.07.30.
Location: Borsod County
Length: 24.2 kmHossz: 24.2 km
Asphalt: 150 000 tAszfalt: 150 000 t
Concrete: 146 000 m3Beton: 146 000 m3
Earthworks: 3 700 000 m3Földmunka: 3 700 000 m3
Number of structures: 21Műtárgyak száma: 21
Asphalt: 150 000 tAszfalt: 150 000 t
Concrete: 146 000 m3Beton: 146 000 m3
Earthworks: 3 700 000 m3Földmunka: 3 700 000 m3
Number of structures: 21Műtárgyak száma: 21