Hódmezővásárhely bypass on main road 47
The tender was won by Colas Út Zrt. in consortium with Délút Kft., Colas Közlekedésépítési Kft. and Colas Hungária Zrt. The Colas Group performs 80% of all jobs, Délút Kft. constructs 20%.
Colas Út Zrt. builds the main carriageway, the road connections and earth roads between chainages 0+000 and 8+900 km. Colas Közlekedésépítő Kft. and Colas Hungária Zrt. are responsible for engineering structures (underpass below main road 45, overpass above Szolnok-Hódmezővásárhely railway line no. 130, overpass above Szeged-Békéscsaba railway line no. 135, pedestrian and bicycle underpass). Délút Kft. is constructing the main carriageway, road connections and earth roads between chainages 8+900 and 12+620 km.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 03/11/2016Kezdés: 2016.11.03.
Completion date: 11/05/2018Befejezés: 2018.05.11.
Location: Hódmezővásárhely