The works along the route of expressway M0 affected four municipal areas in the said section, including the 15th and 16th districts of Budapest and Csömör and Fót in Pest County. The two main units of this section of the expressway include the construction of an 8 km length of new concrete paving, enlargement of the M0–M3 junction and widening of the existing road No 2/B between Motorway M3 and road No. 2/A.
For the construction of the concrete pavement we used a special concrete mixture type CP 4/2,7 – 32/S1, XF4. Two mixing plants of 120 m3/hour capacities each running round the clock provided the necessary quantity. The 11.00 m, 10.25 m and 7.50 m wide carriageways were built by the use of slipform
finisher type WIRTGEN 1600 SP. The 2.75 m wide emergency lane and the 3.50 m – 5.50 m wide intermediate lanes were built by a finisher type WIRTGEN 500 SP. In contrast to the usual practice in Hungary the contractors have undertaken for this project component 60 months of warranty backed by bank guarantee and additional 72 months of guarantee under bank guarantee.
Client: Nemzeti Infrastruktúra Fejlesztő Zrt.
Starting date: 20/03/2006Kezdés: 2006.03.20.
Completion date: 16/09/2008Befejezés: 2008.09.16.
Section: 59+800-70+994Szelvény: 59+800-70+994
Number of lanes: 2+emergency laneSávok száma: 2+emergency lane
Asphalt: 60 000 tAszfalt: 60 000 t
Concrete: 46 442 m3Beton: 46 442 m3
Earthworks: 1 995 276 m3Földmunka: 1 995 276 m3
Number of structures: 17Műtárgyak száma: 17